Mission Trail Baptist Hospital
The Mission Trail Baptist Hospital features 220,000 state of the art square feet of feet of medical facilities including 3 floors and 110 private patient rooms with potential expansion to 6 floors and 300 patient rooms.
Mission Trail Baptist Hospital has achieved LEED certification from U.S. Green Building Council (USGBC). The LEED building certification program is a nationally accepted benchmark for the design, construction, and operation of green buildings. Mission Trail is the first hospital in San Antonio to achieve LEED certification.
Featured Amenities:
- Patient rooms with access to natural light and views
- Noise reduction construction and finishes
- All private rooms
- Adequate space for families to stay overnight in patient rooms
Procedure Rooms:
- 4 ORs, Cath Lab and 2 GI Labs
Patient Rooms:
- 20 ICU beds w/ eICU capability
- 66 Med/Surg/Tele beds
- 7 LDRP
- 9 Postpartum
- 8 NICU
- 15 Baby Nursery
Imaging:
- Nuclear Med
- Digital Radiography
- 16 Slice CT
- 2 Ultrasounds
ED:
- 17 Exam rooms
- 2 Trauma rooms
- 2 Triage rooms
- Results pending area
- Separate Ambulance Entrance
- Split Flow model will be implemented








